SCALEDPLANS / EXAMPLE OUTPUTS · SP1 / Sample lot A

Deck placement sheet

EXAMPLE OUTPUT · REVIEW PROJECT SCOPE BEFORE USE

Example 60 × 100 ft lot. Dimensions below describe this example geometry, not legal boundaries or required setbacks. The drawing uses the stated coordinates and a graphic scale. On a print or resized screen, use the labeled dimensions and scale bar; do not assume a fixed print ratio.

Swipe the drawing to inspect its labels →

Deck placement: dimensioned house, deck, stairs and measured boundary offsets SAMPLE STREET / FRONT EXISTING HOUSE36 × 40 ft Stair + landing4 × 8 ft outline DECK16 × 12 ft 60 ft lot100 ft lot 10 ft left offset24 ft rear offset 16 ft12 ft N01020 ftGraphic scale in feet · example geometryOffsets shown are measured distances, not required setbacks.
ElementSample coordinates in feetScope
Boundary(0,0) to (60,100)Origin: front-left corner; north toward front
Existing housex 10–46; y 24–6436 × 40 ft footprint
Deckx 10–26; y 64–7616 × 12 ft = 192 SF
Stair + landing outlinex 26–30; y 68–764 × 8 ft schematic projection
Left / rear offsetsDeck left x=10; rear y=7610 ft left; 24 ft rear
Boundary sourceLot dimensions supplied with the projectReplace with current survey/plat

What to supply

A survey or recorded plat with readable dimensions, the project sketch, existing structures, stair/landing extent and your permit office checklist. Ask the owner for the survey; a GIS screenshot or address does not establish surveyed boundaries. If the base is missing, resolve it before drawing.

What to check

The sheet labels supplied offsets. It does not look up or verify local setback rules. Obtain the applicable requirements from the reviewing jurisdiction and check all projections, easements and coverage definitions. No Raleigh, Wake County or other local acceptance is claimed.

Separate documents

Footing, ledger, beam, guard and structural drawings are separate. This is a placement example, not a construction package or permit submission. For an ADU, coordinate architectural, utility and access sheets separately. Delivery time and permit-correction terms require an explicit project agreement.