Electrical coordination sheet
EXAMPLE OUTPUT · REVIEW PROJECT SCOPE BEFORE USE
Example single-line and panel schedule output for equipment coordination. Equipment identifiers connect this one-line outline and schedule. Ratings and connection details are deliberately unresolved; this is not a solar design, load calculation or installation instruction.
Swipe the drawing to inspect its labels →
| Reference | Schedule entry | Verified source / status |
|---|---|---|
| SE1 | Service equipment | Nameplate rating and source: unresolved |
| P1 | Distribution panel | Bus rating and circuit identifiers: unresolved |
| PV1 | Proposed solar inverter | Model, output and listing data: unresolved |
| P1 / existing circuits | Circuit descriptions and loads | Field verification required |
| PV connection | Interconnection method and point | Designer and utility requirements required |
What the $79 package covers
The offer is one single-line diagram plus matching panel schedule. A service-load calculation, engineering approval and technical human review are not specified as included. Do not assume an NEC 220.82 worksheet is part of this package.
Inputs and corrections
Supply readable panel labels, equipment schedules and the reviewed design. Record a source for each identifier. Confirm uncertain photo readings with the responsible qualified person before using them in a drawing. This sample does not demonstrate photo extraction or automatic updates.
Electrical calculation scope
Manual J is HVAC heating/cooling load, not an electrical service-load calculation. ScaledPlans does not claim support for NEC 220.82 or a particular electrical code edition here. Supply the appropriate separate calculation and coordinate its equipment identifiers with the drawings.
Review record
Review status: pending project verification. No equipment sizing, conductor sizing, breaker selection, local submittal acceptance or utility approval is established. Real ratings, technical review, delivery and correction terms must be confirmed for the project.